City of Stuart

WTP - PER-FLUORINATED CHEMICAL TREATMENT SYSTEM

Installation of an 8 MGD ION Exchange System treating PFCs for drinking water; including resin vessels including resin, 100-HP single stage horizontal split case pumps, ductile iron piping and accessories, concrete slab-on-grade, variable frequency drive local control panels, electrical and I&C improvements.  At the time of construction, this was the largest resin PFC drinking water system of its kind.

City of Bartow

DOUG ALLEN WRF - CONTROL SYSTEMS UPGRADES

The Project consisted of sequencing batch reactors (SBR) control system upgrades, including constructing a new PLC-based control system for the existing SBR, new field instrumentation for the control system, connecting existing equipment, as well as replacement of existing 200-HP blower motors,  and start-up services for the new system.

Brevard County

MIMS WTP - HIGH SERVICE PUMP VFD & PLC REPLACEMENT

The project consisted of replacement of programmable logic controllers control panels, high service pump variable frequency drives, a high service pump motor, along with related electrical and control conduits, wiring, control system programming, SCADA system programming and equipment/ systems startups.

LAWRENCE LEE CONSTRUCTION SERVICES, INC.

561-578-7715

  • social-linkedin-box-blue-icon

©2018 BY LAWRENCE LEE CONSTRUCTION SERVICES, INC.