top of page
Ground_5.jpg

City of Stuart

WTP - PER-FLUORINATED CHEMICAL TREATMENT SYSTEM

Installation of an 8 MGD ION Exchange System treating PFCs for drinking water; including resin vessels including resin, 100-HP single stage horizontal split case pumps, ductile iron piping and accessories, concrete slab-on-grade, variable frequency drive local control panels, electrical and I&C improvements.  At the time of construction, this was the largest resin PFC drinking water system of its kind.

IMG_5200.JPG

City of Bartow

DOUG ALLEN WRF - CONTROL SYSTEMS UPGRADES

The Project consisted of sequencing batch reactors (SBR) control system upgrades, including constructing a new PLC-based control system for the existing SBR, new field instrumentation for the control system, connecting existing equipment, as well as replacement of existing 200-HP blower motors,  and start-up services for the new system.

IMG_4443.JPG

Brevard County

MIMS WTP - HIGH SERVICE PUMP VFD & PLC REPLACEMENT

The project consisted of replacement of programmable logic controllers control panels, high service pump variable frequency drives, a high service pump motor, along with related electrical and control conduits, wiring, control system programming, SCADA system programming and equipment/ systems startups.

dixie park.jpg

Dixie Park Facility

Demolition & In-Line Booster Pump Station Replacement

The project consisted of demolition of an abandon WWTP  and In-Line Booster Pump Station. Construction included modifications to a surge tank, electrical I&C, and construction of an in-line booster pump station.

Picture3.jpg

Naples WTP

Accelator #3 Rehabilitation and Improvements

Complete replacement of an accelator mechanism.  Removal of the existing mechanism, lime-sludge, installation of proposed accelator; including rafters, hood plates, gear box, sludge flushing system, and catwalk and coatings.

lake wales.png

Lake Wales

Reuse Pump Station - Modifications

Rehabilitation of an existing Reuse Booster Pump Station and ground storage tank. This project consisted of removing pumps and piping, install of 100HP Reuse Pumps, flow meter vault, install of a metal canopy, rehab of a glass-lined ground storage tank, and I&C upgrades.

deerfield.jpg

Deerfield Beach

West WTP Solids Contact Clarifier Rehabilitation

Rehabilitation of an existing 62FT lime softening accelator. Rehab was required to be performed in a short timeframe of 6 weeks which included removal of lime sludge, removal and replacement of a clarifier mechanism metal parts, and final coatings. The project also included refurbishment of 2 Aeration towers including: prep, painting, and media replacement.

indian river.jpg

Indian River

Hobart RO WTP - Chemical Tanks Replacement

Replacement of a 16,000-gal bulk sulfuric acid tank with a new 12,000-gal horizontal steel storage tank.  Replacement of a 5,200-gal bulk caustic tank with a new 5,200-gal horizontal steel storage tank.  Replacement of the tanks required new PVCF and secondary containment piping, minor electrical and I&C modifications, and containment coatings

IMG_0009.JPG

South Martin
Regional Utility

WWTP - Filter & Chlorine Contact Basin Improvements 

Installation of (1) 1.6 MGD Disk Filter and rehabilitation of (2) 1.6 MGD existing Disk Filters totaling 4.8 MGD.  Installation of a reinforced concrete Chlorine Contact containing (2) chambers. Removal of (2) Traveling Bridge Filters, yard piping, electrical and I&C.

St. Lucie West

WWTP - Filter #2 Replacement 

Demolition of an existing traveling bridge filter and installation of (2 EA) 2.0 MGD cloth media disk filters, installation of disk filter equipment, structural modifications, slide gates, piping, electrical system modifications and I&C.

bottom of page